logo
  • Search
  • Phone
  • Menu
  • logo
  • About
  • Products
    • All Products
    • Choosing the Correct Weepa
    • Product Selector Tool
    • New Generation Bushfire Weepa
    • High Performance Bushfire Weepa
    • Standard Weepa
    • Stainless Steel Weepa
    • 50mm Stainless Steel Weepa
    • 70mm Bushfire Weepa
    • 70mm Weepa
    • 90mm Extension
    • Protector Weep Hole Screen
    • Termite Protector Weep Hole Screen
  • Stockists
  • Knowledge
    • All articles
    • Bushfire Compliance
    • Pest Protection
    • Weephole Functionality
  • Videos
    • Installing Weepas during Construction
    • Protector Installation
    • Termite Protector Installation
    • Protector & Termite Protector Duo Installation
    • Mice and Weepholes
    • Bushfires and Weepholes
    • Changing Grates for Compliance
    • Importance of Weepholes
    • About Weepa
  • Downloads
  • FAQ
  • Contact
  • Search

  1. Home
  2. Videos
  3. Installing Weepas during Construction

Installing Weepas during Construction

Transcript

Weepa make a wide range of Weep hole formers for installation during construction to ventilate cavity walls. The range includes the Standard Weepa, the High Performance Bushfire Weepa, the New Generation Bushfire Weepa and the Stainless Steel Weepa.

In this video, we'll show you how to install the Stainless Steel Weepa in face brick walls as well as how to render around the Weepa after installation. We'll be using the stainless Weepa for this demonstration, but the techniques used in this video apply to the entire Weepa range.

When installing in face brick walls, place the Weepa in the perpend at specified intervals. You must have the weephole at at least every 1.2 metres to be compliant with the Australian building code. Make sure the Weepa is firmly in contact with the flashing.

If you intend on rendering, set the Weepa out five to 10 millimeters depending on the thickness of your render. This will make it easier to adjust for a great finish later. If you're not rendering, then ensure to remove the mortar guards after cleanup.

This needs to be done to ensure ventilation is adequate. The screening grate on all types of Weepas can be opened to clean out any debris, allow for inspection and pest management where appropriate. When rendering, first loosen the Weepa in the wall with a pair of pliers and pull it outwards. Then apply your render around the Weepas as you normally would.

Once you've applied your final coat, pat the Weepa back into the wall so it's flush with the render. Float around and over the top of the Weepa then sponge to finish. Make sure you wipe over the mortar guard so that it's easier to remove after painting. Once the mortar and paint are dry, remove the cover for a perfect finish. Weepa products are available in hardware stores Australia wide. See our website for your nearest supplier.

Explore Weepa

  • Home
  • About
  • Products
  • Stockists
  • Knowledge
  • Videos
  • Downloads
  • FAQ
  • Contact

Products

  • All Products
  • Choosing the Correct Weepa
  • Product Selector Tool
  • New Generation Bushfire Weepa
  • High Performance Bushfire Weepa
  • Standard Weepa
  • More

Knowledge

  • More
  • Facebook
  • webenquiries@weepa.com.au
  • 07 3844 3744
3/15 Donkin Street, West End QLD 4101 (9am-4pm) | 
PO Box 3325, South Brisbane QLD 4101
logo
© 2025 Weepa Products Pty Ltd

The Weepa range is subject to Intellectual Property Rights. Aust Pat Nos 2007237177, 2007215369, 2008271915, 2013211506, 2018902177. Aust Pat Ap 2019900971. International PCT AU2019/050629, PCT AU2020/050270. NZ Pat Nos 567674, 716834. Sth African Pat No 2008/03841. US Pat Nos 8171677, 9903108. Canadian Pat Nos 2629033, 2916320. UK Pat No 1984580. Aust TM 775282, NZ TM 961710, US TM 1145302, UK TM 00801145302.

  • Home
  • About
  • Products
  • Stockists
  • Knowledge
  • Videos
  • Downloads
  • FAQ
  • Contact