• Installing Weepas during Construction

  • Weepas in Masonry

    Step 1 Standard Masonry

    Step 1

    Install the Weepa between bricks or blocks, at specified intervals and firmly in contact with the flashing. For rendering, set out a few millimetres.

    Step 2 Standard Masonry

    Step 2

    When rendering, the Weepa needs to be loosened in the masonry so the renderer can adjust the Weepa in and out. Grab internal rib to adjust Weepa in and out.

    Step 3 Standard Masonry

    Step 3

    After clean up, use a small, flat screwdriver to prise the mortar cover up at the bottom.

    Step 4 Standard Masonry

    Step 4

    Close the grate assembly for an attractive and vermin proof weep hole.

  • Weepas in Rendered Masonry

    Step 1 Standard Render

    Step 1

    Make sure the Weepa is installed when the masonry wall is built.

    Step 2 Standard Render

    Step 2

    Loosen the Weepa and pull out proud of masonry.

    Step 3 Standard Render

    Step 3

    Lay on render around the Weepa.

    Step 4 Standard Render

    Step 4

    Screed off around the Weepa.

    Step 5 Standard Render

    Step 5

    Pat the Weepa flush with the surface.

    Step 6 Standard Render

    Step 6

    Float around the Weepa.

    Step 7 Standard Render

    Step 7

    Sponge finish.
    For easy removal later, wipe the mortar guard clean now, then again after painting.

    Step 8 Standard Render

    Step 8

    After finish and cleanup remove the mortar guard for beautiful weepholes.